Welded & Seamless Steel Pipe Posts, 4": Mississippi winning bid prices

The low bidder priced welded & seamless steel pipe posts, 4" at a median $120 per linear foot over the last 12 months (1 contracts) and up 100% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$120
1 contracts
Median, prior 12 months
–
Median, 2020
$60.00
6 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$40$60$80$100$1202020202120222023202420252026*$120
Price vs. quantityEvery winning price since 2020 (log scale)
$40$60$80$100$1201001.0K
Does quantity matter?Median winning price by quantity band
$0$25$50$75$100$91.50≤43$65.0043–118$60.00118–388$58.47>388

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren60 LF$120$1253
Jan 24, 2024Interchange Reconstruction on I-10 at Diamondhead, known as Federal Aid Project No. NHPP-0Hancock18 LF$91.50$90.003
Dec 5, 2023Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison305 LF$73.05$69.532
Nov 2, 2023Bridge Replacements & Bank Stabilization on US 98 at the Pearl River (Bridge Nos. 118.5A &Marion36 LF$112$1062
Oct 24, 2023Construction project, Wayne CountyWayne387 LF$59.00$58.653
Oct 25, 2022Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson1.6K LF$55.00$60.332
Jan 25, 2022Intersection Improvements on SR 826 at SR 14 & USSharkey15 LF$93.00$79.502
Aug 24, 2021Construction project, Jackson CountyJackson32 LF$68.00–2
Jul 27, 2021Pavement Restoration approximately 14 miles on I-59 from the Lamar County Line to the JoneForrest, Jones950 LF$70.00$71.422
Jun 22, 2021Overlay approximatelyMadison108 LF$65.00$65.004
May 25, 2021Construction projectDistrict 61.2K LF$51.00$59.502
Apr 27, 2021Intersection Improvements on US 84 at Reservoir Road / Magnolia Hill Road & SR 184Wayne182 LF$58.00–4
Mar 2, 2021Overlay approximatelyKemper47 LF$58.00$58.002
Jan 26, 2021Bridge Rail Replacement on USRankin37 LF$78.00–1
Oct 27, 2020Construction project, Neshoba CountyNeshoba548 LF$60.00$60.003
May 27, 2020Construction project, Marion CountyMarion45 LF$60.00–1
Mar 24, 2020Construction project, Jackson CountyJackson128 LF$60.00–3
Feb 25, 2020Construction project, DeSoto CountyDeSoto151 LF$60.00$66.663
Feb 25, 2020Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between FairItawamba391 LF$58.47$57.753
Jan 28, 2020Safety Improvements on SRScott62 LF$75.00$72.253

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access