The low bidder priced conventional static pile load test at a median $5,000 per each over the last 12 months (4 contracts), flat from the year before and flat since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 1 EA | $5,000 | $5,000 | 3 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 1 EA | $5,000 | $5,000 | 4 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 1 EA | $5,000 | $5,000 | 8 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 1 EA | $5,000 | $5,000 | 7 |
| Sep 23, 2025 | Bridge Replacement on SR 704 (Bridge No. 162.5)Benton | 1 EA | $5,000 | $5,000 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 11 EA | $5,000 | $5,000 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 12 EA | $5,000 | $5,000 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 9 EA | $5,000 | $5,000 | 2 |
| Jan 28, 2025 | Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee | 1 EA | $5,000 | $5,000 | 5 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 1 EA | $5,000 | $5,000 | 4 |
| Oct 22, 2024 | Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc | 1 EA | $5,000 | $5,000 | 4 |
| Oct 22, 2024 | Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes | 1 EA | $5,000 | $5,000 | 4 |
| Jul 30, 2024 | Bridge Replacement on SRSunflower | 1 EA | $5,000 | $5,000 | 4 |
| Jun 4, 2024 | Bridge Replacements on USHolmes | 6 EA | $5,000 | $5,000 | 7 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 12 EA | $5,000 | $5,000 | 2 |
| Apr 2, 2024 | Construction project, Madison CountyMadison | 4 EA | $5,000 | $5,000 | 7 |
| Jan 31, 2024 | Bridge Replacement on USJackson | 1 EA | $5,000 | $5,000 | 5 |
| Jan 31, 2024 | Construction project, Choctaw CountyChoctaw | 2 EA | $5,000 | $5,000 | 5 |
| Jan 31, 2024 | Bridge Replacements on SR 395 between SRWinston | 2 EA | $5,000 | $5,000 | 2 |
| Jan 24, 2024 | Interchange Reconstruction on I-10 at Diamondhead, known as Federal Aid Project No. NHPP-0Hancock | 1 EA | $5,000 | $5,000 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.