MDOT pay item · 219-A001

Watering: Mississippi winning bid prices

The low bidder priced watering at a median $20.00 per thousand gallons over the last 12 months (28 contracts), flat from the year before and flat since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$20.00
28 contracts
Median, prior 12 months
$20.00
22 contracts
Median, 2020
$20.00
22 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$202020202120222023202420252026*$20.00
Price vs. quantityEvery winning price since 2020 (log scale)
$201101001.0K
Does quantity matter?Median winning price by quantity band
$0$5$10$15$20$20.00≤4$20.004–12$20.0012–56$20.00>56

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison59 KGAL$20.00$20.003
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren25 KGAL$20.00$20.003
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin9 KGAL$20.00$20.004
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson12 KGAL$20.00–1
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall6 KGAL$20.00$20.004
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin170 KGAL$20.00$20.006
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha50 KGAL$20.00–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike59 KGAL$20.00$20.003
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie19 KGAL$20.00$20.006
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba1 KGAL$20.00$20.004
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey1 KGAL$20.00$20.003
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee2 KGAL$20.00$20.008
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest12 KGAL$20.00$20.003
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison3 KGAL$20.00$20.003
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee1 KGAL$20.00$20.005
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto7 KGAL$20.00$20.006
May 27, 2026Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake1 KGAL$20.00$20.008
May 27, 2026Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison2 KGAL$20.00$20.005
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin14 KGAL$20.00$20.002
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee3 KGAL$20.00$20.002

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.