The low bidder priced structural steel angles & bars, 3" x 3" x 1/4" angles at a median $5.25 per pound over the last 12 months (8 contracts), up 26% from the year before and up 97% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 132 LBS | $5.25 | $5.25 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 36 LBS | $11.25 | $11.25 | 3 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 307 LBS | $5.50 | $5.55 | 6 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 137 LBS | $5.24 | – | 4 |
| Jul 28, 2026 | Widening on I-10 at MS 605 WB RampHarrison | 74 LBS | $4.10 | $4.10 | 3 |
| Jul 28, 2026 | Traffic Signal and Interchange Modifications on US 45 & US 278Lee | 54 LBS | $5.00 | $5.00 | 5 |
| Apr 10, 2026 | Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo | 785 LBS | $5.18 | $1.06 | 3 |
| Nov 25, 2025 | Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington | 324 LBS | $7.00 | $6.70 | 4 |
| Sep 4, 2025 | Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln | 14 LBS | $6.15 | $6.25 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 142 LBS | $0.50 | $0.55 | 2 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 247 LBS | $4.15 | $4.10 | 3 |
| Mar 26, 2024 | Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike | 648 LBS | $4.00 | $4.00 | 2 |
| Jan 24, 2024 | Construction project, Jackson CountyJackson | 672 LBS | $2.41 | $2.46 | 2 |
| Jan 24, 2024 | Interchange Reconstruction on I-10 at Diamondhead, known as Federal Aid Project No. NHPP-0Hancock | 227 LBS | $5.35 | $5.25 | 3 |
| Feb 28, 2023 | Construction of a Roundabout on US 72 at SRBenton | 74 LBS | $5.00 | – | 5 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 259 LBS | $4.00 | $4.40 | 2 |
| Nov 23, 2021 | Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington | 98 LBS | $5.40 | $5.20 | 2 |
| Aug 24, 2021 | Construction of a Roundabout on SRMarshall | 83 LBS | $6.00 | $6.00 | 4 |
| Jul 27, 2021 | Pavement Restoration approximately 14 miles on I-59 from the Lamar County Line to the JoneForrest, Jones | 910 LBS | $5.00 | $5.30 | 2 |
| Apr 27, 2021 | Intersection Improvements on US 84 at Reservoir Road / Magnolia Hill Road & SR 184Wayne | 123 LBS | $4.50 | – | 4 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.