The low bidder priced temporary silt fence at a median $4.45 per linear foot over the last 12 months (38 contracts), up 3% from the year before and up 11% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery | 3.0K LF | $5.50 | – | 1 |
| Oct 27, 2026 | Construction project, Madison CountyMadison | 17K LF | $4.40 | $4.70 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 21K LF | $3.00 | $4.00 | 3 |
| Oct 27, 2026 | Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin | 11K LF | $2.00 | $5.25 | 4 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 6.6K LF | $3.54 | – | 1 |
| Oct 27, 2026 | Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall | 200 LF | $10.30 | $7.50 | 4 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 37K LF | $4.00 | $4.42 | 6 |
| Sep 22, 2026 | Bridge Removal on SR 373 (Bridge Nos. 9.9 & 10.3)Lowndes, Monroe | 3.3K LF | $5.50 | $5.50 | 6 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 1.0K LF | $5.00 | – | 4 |
| Sep 22, 2026 | Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington | 1.0K LF | $10.00 | $7.50 | 4 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 8.3K LF | $4.35 | $4.35 | 3 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 23K LF | $4.00 | $4.13 | 6 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 900 LF | $10.00 | $6.33 | 4 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 1.8K LF | $4.00 | $4.42 | 8 |
| Aug 25, 2026 | Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren | 402 LF | $5.21 | $16.00 | 3 |
| Aug 21, 2026 | Emergency Slope Repair & Pipe Cleanout on SR 26George, Perry | 300 LF | $12.00 | $9.95 | 3 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 16K LF | $8.00 | $4.40 | 3 |
| Jul 28, 2026 | Bank Stabilization on SR 12 over Big Black River (Bridge No. 83.4)Holmes, Attala | 810 LF | $5.80 | $5.40 | 10 |
| Jul 28, 2026 | Widening on I-10 at MS 605 WB RampHarrison | 2.5K LF | $4.00 | $4.00 | 3 |
| Jul 28, 2026 | Traffic Signal and Interchange Modifications on US 45 & US 278Lee | 400 LF | $8.00 | $8.00 | 5 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.