The low bidder priced removal of concrete driveways, all depths at a median $27.50 per square yard over the last 12 months (6 contracts), down 23% from the year before and up 112% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 70 SY | $136 | $44.17 | 6 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 1.4K SY | $25.00 | $21.60 | 3 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 168 SY | $50.00 | $38.15 | 4 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 318 SY | $20.00 | $25.00 | 6 |
| May 27, 2026 | Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin | 289 SY | $10.00 | $13.82 | 2 |
| May 27, 2026 | Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee | 39 SY | $30.00 | $30.75 | 2 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 287 SY | $25.00 | $30.00 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 108 SY | $43.00 | $43.00 | 3 |
| Jun 24, 2025 | Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson | 335 SY | $36.00 | $35.50 | 2 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 600 SY | $25.00 | $16.75 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 102 SY | $35.75 | $22.50 | 5 |
| Jan 28, 2025 | Overlay approximately 10 miles of SR 43 from SR 481 to the Madison County LineRankin | 7 SY | $209 | $209 | 4 |
| Jan 28, 2025 | Drainage Improvements on US 61 near BlakelyWarren | 215 SY | $17.09 | – | 1 |
| Jul 11, 2024 | Construction project, Madison CountyMadison | 100 SY | $6.00 | $9.50 | 3 |
| May 29, 2024 | Overlay approximatelyClarke | 102 SY | $55.00 | – | 1 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 2.0K SY | $20.00 | $20.50 | 2 |
| Jan 31, 2024 | Intersection Improvements on USDeSoto | 49 SY | $35.00 | $42.50 | 4 |
| Jan 31, 2024 | Bridge Replacements on SR 395 between SRWinston | 18 SY | $100 | $65.58 | 2 |
| Jan 24, 2024 | Intersection Improvements at SRSmith | 494 SY | $6.00 | $11.25 | 5 |
| Jan 24, 2024 | Interchange Reconstruction on I-10 at Diamondhead, known as Federal Aid Project No. NHPP-0Hancock | 1.2K SY | $29.50 | $29.50 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.