BidCrew Data
BidCrew Data / Mississippi / Prices / 36" Reinforced Concrete Pipe, Class III
MDOT pay item · 603-CA055

36" Reinforced Concrete Pipe, Class III: Mississippi winning bid prices

The low bidder priced 36" reinforced concrete pipe, class iii at a median $147 per linear foot over the last 12 months (7 contracts), down 25% from the year before and up 60% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$147
7 contracts
Median, prior 12 months
$195
6 contracts
Median, 2020
$92.00
3 contracts
Winner vs. field
1% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$50$100$150$200$2502020202120222023202420252026*$147
Price vs. quantityEvery winning price since 2020 (log scale)
$0$100$200$300$400101001.0K
Does quantity matter?Median winning price by quantity band
$0$50$100$150$200$200≤16$14016–48$15948–204$135>204

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison96 LF$147$3003
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson200 LF$158–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin368 LF$147$1616
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie168 LF$137$1406
Jul 28, 2026Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds60 LF$325$3253
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto24 LF$139$1716
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin32 LF$170$1832
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette16 LF$200$2003
Aug 26, 2025Mill & Overlay approximately 9 miles of SR 346 from the beginning of State Maintenance to Pontotoc64 LF$218$2695
Mar 25, 2025Installation of Median Cable Barrier on I-22 from Coldwater River to the Marshall County LDeSoto, Marshall48 LF$300$2185
Mar 4, 2025Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba216 LF$190$1492
Jan 28, 2025Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee48 LF$145$1455
Jan 28, 2025Drainage Improvements on US 61 near BlakelyWarren300 LF$169–1
Oct 22, 2024Intersection Improvements on SR 25 at Mt. Helm Road and at Pisgah RoadRankin16 LF$225$2282
Oct 22, 2024Construction of a Roundabout on SR 3 at Willie Morris ParkwayYazoo16 LF$191–1
Aug 27, 2024Construction project, Yalobusha CountyYalobusha32 LF$137$1692
Jul 11, 2024Construction project, Madison CountyMadison416 LF$135$1223
Jun 11, 2024Construction project, Lafayette CountyLafayette16 LF$200$2155
Apr 23, 2024Mill & Overlay approximately 9.5 miles of SR 469 from Florence to SR 468Rankin16 LF$300$3004
Apr 23, 2024Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah1.9K LF$140$1452

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access