The low bidder priced soil-cement-water mixing, optional mixers, design soil at a median $3.45 per square yard over the last 12 months (1 contracts), up 15% from the year before and up 160% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 119K SY | $3.45 | $1.65 | 3 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 160K SY | $2.25 | $2.25 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 257K SY | $3.00 | $2.50 | 2 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 9.3K SY | $3.50 | $3.14 | 4 |
| Jul 11, 2024 | Construction project, Madison CountyMadison | 110K SY | $2.80 | $2.18 | 3 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 61K SY | $3.75 | $3.73 | 2 |
| Jan 24, 2024 | Construction project, Jackson CountyJackson | 215K SY | $1.60 | $1.73 | 2 |
| Nov 2, 2023 | Bridge Replacements & Bank Stabilization on US 98 at the Pearl River (Bridge Nos. 118.5A &Marion | 8.3K SY | $3.25 | $3.17 | 2 |
| Aug 22, 2023 | Bridge Replacements on USFranklin | 5.8K SY | $2.60 | $2.58 | 2 |
| Aug 1, 2023 | Construction project, Pontotoc CountyPontotoc | 96K SY | $2.15 | $2.17 | 2 |
| Nov 23, 2021 | Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington | 249K SY | $1.60 | $1.30 | 2 |
| Aug 24, 2021 | Construction project, Jackson CountyJackson | 17K SY | $1.65 | – | 2 |
| Oct 27, 2020 | Construction project, Neshoba CountyNeshoba | 168K SY | $1.40 | $1.40 | 3 |
| Mar 24, 2020 | Construction project, Jackson CountyJackson | 36K SY | $2.25 | – | 3 |
| Feb 25, 2020 | Construction project, DeSoto CountyDeSoto | 45K SY | $1.25 | $1.33 | 3 |
| Feb 25, 2020 | Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between FairItawamba | 238K SY | $1.22 | $1.21 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.