BidCrew Data
BidCrew Data / Mississippi / Prices / Size 825B Crushed Stone Base
MDOT pay item · 304-F003

Size 825B Crushed Stone Base: Mississippi winning bid prices

The low bidder priced size 825b crushed stone base at a median $80.41 per ton over the last 12 months (22 contracts), down 5% from the year before and up 101% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$80.41
22 contracts
Median, prior 12 months
$84.50
21 contracts
Median, 2020
$40.00
13 contracts
Winner vs. field
5% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$20$40$60$80$100$1202020202120222023202420252026*$80.83
Price vs. quantityEvery winning price since 2020 (log scale)
$0$50$100$150$2001001.0K10K100K
Does quantity matter?Median winning price by quantity band
$0$25$50$75$100$100≤1.0K$65.001.0K–3.3K$65.003.3K–6.8K$58.00>6.8K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike279 TON$111$1113
Oct 27, 2026Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke845 TON$92.65$1022
Oct 27, 2026Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Lamar, Forrest132 TON$105–1
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren28K TON$109$1253
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson6.4K TON$80.83–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin71K TON$71.00$95.006
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha6.8K TON$58.00–4
Jul 28, 2026Micro-Surface approximately 14 miles of SR 512 & SR 513Clarke945 TON$101$1142
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest8.4K TON$74.05$75.003
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison1.3K TON$70.00–3
Jun 30, 2026Thin Lift Overlay approximately 10.1 miles of MS 35 from 4 Forks to the Grenada County LinCarroll25 TON$45.00$45.003
Jun 23, 2026Mill & Overlay approximately 3.87 miles of SR 149 from US 49S to US 49NStone503 TON$94.00$91.002
Jun 23, 2026Thin Lift Overlay approximately 8.5 miles of SR 514 from SR 513 to SR 145, approximately 0Clarke, Jasper11K TON$76.00$79.003
May 27, 2026Buildings project, George CountyGeorge3.9K TON$95.00–1
May 27, 2026Overlay approximately 11.4 miles of SR 15 from Ovett-Scarbrough Road to south of Tuckers CJones5.9K TON$74.00$72.002
May 8, 2026Level & Overlay approximately 8.4 miles on SR 18 from Smith County Line to east of Bay SprJasper3.3K TON$58.00$98.003
Apr 28, 2026Overlay approximately 14.5 miles on US 98 from 1.05 miles east of SR 29 to the Greene CounPerry19K TON$46.00$49.602
Feb 24, 2026Mill & Overlay approximately 9 miles of SR 397 from the Kemper County Line to Robertson RoWinston70 TON$120$1204
Feb 24, 2026Bridge Repair on US 61 over Deer Creek and US 49W over Lake Dawson on Bridge Nos. 179.1, 2Washington, Sunflower50 TON$282$3417
Nov 25, 2025Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington13K TON$60.00$78.004

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access