The low bidder priced changeable message sign at a median $5,250 per each over the last 12 months (50 contracts), down 20% from the year before and down 5% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Bridge Repair on MS 19 over the Big Black River (Bridge No. 114.9)Attala | 2 EA | $10,000 | $3,675 | 4 |
| Oct 27, 2026 | Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke | 4 EA | $4,709 | $8,629 | 2 |
| Oct 27, 2026 | Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Lamar, Forrest | 2 EA | $13,100 | – | 1 |
| Oct 27, 2026 | Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River | 2 EA | $11,500 | – | 1 |
| Oct 27, 2026 | Construction project, Madison CountyMadison | 2 EA | $17,830 | $17,830 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 7 EA | $14,500 | $13,500 | 3 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 6 EA | $6,490 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 21 EA | $8,182 | $8,091 | 6 |
| Sep 22, 2026 | Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9)Union | 2 EA | $4,450 | $4,580 | 6 |
| Sep 22, 2026 | Bridge Removal on SR 373 (Bridge Nos. 9.9 & 10.3)Lowndes, Monroe | 2 EA | $4,500 | $4,000 | 6 |
| Sep 22, 2026 | Bridge Repair on SR 433 over Mound Creek (Bridge No. 11.6)Yazoo | 2 EA | $2,750 | $4,548 | 4 |
| Sep 22, 2026 | Bridge Repair on SR 532 over Stream (Bridge No. 13.5)Covington | 4 EA | $3,898 | $3,976 | 6 |
| Sep 22, 2026 | Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approxiDeSoto, Tate | 6 EA | $5,775 | $5,885 | 3 |
| Sep 22, 2026 | Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington | 5 EA | $3,685 | $5,046 | 4 |
| Sep 22, 2026 | Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn | 4 EA | $3,530 | $3,530 | 7 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 4 EA | $10,190 | $10,190 | 3 |
| Aug 25, 2026 | Mill & Overlay approximately 0.5 miles East of US 61Washington | 2 EA | $4,830 | – | 1 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 4 EA | $5,000 | $4,315 | 4 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 12 EA | $3,500 | $3,588 | 8 |
| Aug 25, 2026 | Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren | 6 EA | $6,770 | $6,600 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.