The low bidder priced 36" reinforced concrete end section at a median $1,995 per each over the last 12 months (9 contracts), down 15% from the year before and up 33% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 4 EA | $1,995 | $3,000 | 3 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 3 EA | $1,682 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 13 EA | $1,865 | $2,079 | 6 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 4 EA | $2,200 | $2,090 | 6 |
| Jul 28, 2026 | Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds | 2 EA | $1.00 | $1.00 | 3 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 1 EA | $2,000 | $2,450 | 6 |
| May 27, 2026 | Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin | 2 EA | $2,500 | $2,807 | 2 |
| May 8, 2026 | Level & Overlay approximately 8.4 miles on SR 18 from Smith County Line to east of Bay SprJasper | 1 EA | $1,714 | $1,714 | 3 |
| Nov 25, 2025 | Ditch Repair on I-20 near the Springridge Road InterchangeHinds | 1 EA | $2,051 | $2,051 | 5 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 2 EA | $2,000 | $2,130 | 3 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 1 EA | $2,500 | $2,447 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 5 EA | $2,600 | $2,475 | 2 |
| Jan 28, 2025 | Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee | 1 EA | $2,350 | $2,350 | 5 |
| Jan 28, 2025 | Drainage Improvements on US 61 near BlakelyWarren | 1 EA | $1,610 | – | 1 |
| Oct 22, 2024 | Construction of a Roundabout on SR 3 at Willie Morris ParkwayYazoo | 2 EA | $2,500 | – | 1 |
| Jul 11, 2024 | Construction project, Madison CountyMadison | 4 EA | $2,200 | $2,005 | 3 |
| Jun 11, 2024 | Construction project, Lafayette CountyLafayette | 1 EA | $1,800 | $2,500 | 5 |
| Apr 23, 2024 | Mill & Overlay approximately 9.5 miles of SR 469 from Florence to SR 468Rankin | 2 EA | $3,250 | $3,250 | 4 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 28 EA | $2,650 | $2,510 | 2 |
| Mar 26, 2024 | Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike | 4 EA | $3,750 | $3,425 | 2 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.