BidCrew Data
BidCrew Data / Mississippi / Prices / 6" High Performance Cold Plastic Traffic Stripe, Continuous Yellow
MDOT pay item · 907-628-J003

6" High Performance Cold Plastic Traffic Stripe, Continuous Yellow: Mississippi winning bid prices

The low bidder priced 6" high performance cold plastic traffic stripe, continuous yellow at a median $10.00 per linear foot over the last 12 months (17 contracts), down 17% from the year before and down 8% since 2024.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$10.00
17 contracts
Median, prior 12 months
$12.00
17 contracts
Median, 2024
$10.82
8 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$8$10$12$14$162020202120222023202420252026*$9.75
Price vs. quantityEvery winning price since 2020 (log scale)
$5$7.5$10$12.5$15$17.51001.0K10K
Does quantity matter?Median winning price by quantity band
$0$5$10$15$12.00≤484$12.00484–1.6K$9.501.6K–4.3K$10.00>4.3K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 336 frPontotoc225 LF$12.00–1
Oct 27, 2026Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke1.6K LF$7.50$8.152
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River7.4K LF$9.00–1
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn452 LF$11.75$11.007
Jul 28, 2026Micro-Surface approximately 14 miles of SR 512 & SR 513Clarke2.5K LF$9.00$9.892
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee671 LF$15.00$15.005
Jun 23, 2026Widen & Overlay approximately 2 miles of SR 26 from the east end of the Pearl River BridgePearl River2.6K LF$9.50–1
Jun 23, 2026Overlay and OGFC Lift from east of the Shorecrest Road Overpass to approximately 0.9 mile Harrison13K LF$9.15$9.322
Jun 23, 2026Thin Lift Overlay approximately 8.5 miles of SR 514 from SR 513 to SR 145, approximately 0Clarke, Jasper2.6K LF$8.00$8.003
Jun 5, 2026Mill & Overlay approximately 9 miles of SR 25 from US 45A to US 45Monroe400 LF$15.00$15.502
May 27, 2026Overlay approximately 11.4 miles of SR 15 from Ovett-Scarbrough Road to south of Tuckers CJones2.2K LF$10.00$9.502
Apr 28, 2026Overlay approximately 14.5 miles on US 98 from 1.05 miles east of SR 29 to the Greene CounPerry3.5K LF$8.60$9.002
Apr 10, 2026Mill & Overlay approximately 7 miles of US 82 from 1 mile east of Military Road to the AlaLowndes5.7K LF$12.00$12.002
Feb 24, 2026Install Center Audible Stripe, Replace Curve & Intersection Warning Signs, Refresh StripinItawamba140 LF$10.00–1
Nov 25, 2025Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe4.3K LF$10.00$10.004
Oct 28, 2025Bridge Repair on Old West Point Road over US 82 (Bridge No. 160.3)Lowndes484 LF$16.00$17.634
Oct 28, 2025Mill, Level & Overlay approximately 4 miles of US 49 from US 11 to beginning of divided seForrest3.9K LF$10.00$11.002
Aug 26, 2025Level & Overlay approximately 12.5 miles of SR 528 from the west end of the Talahalla CreeJasper954 LF$9.00$10.003
Aug 26, 2025Mill & Overlay approximately 3.5 miles of US 45 from the beginning of the 4-Lane divided sMonroe700 LF$12.00$12.003
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison6.0K LF$11.00$10.753

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access