BidCrew Data
BidCrew Data / Mississippi / Prices / Cable Barrier Terminal Section
MDOT pay item · 610-B001

Cable Barrier Terminal Section: Mississippi winning bid prices

The low bidder priced cable barrier terminal section at a median $5,950 per each over the last 12 months (1 contracts), down 23% from the year before and up 49% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$5,950
1 contracts
Median, prior 12 months
$7,750
4 contracts
Median, 2020
$4,000
3 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$2,500$5,000$7,500$10,000$12,5002020202120222023202420252026*$5,950
Price vs. quantityEvery winning price since 2020 (log scale)
$0$2,500$5,000$7,500$10,000$12,500110
Does quantity matter?Median winning price by quantity band
$0$2,000$4,000$6,000$8,000$6,780≤2$5,8902–16$4,98916–46$5,530>46

The last 17 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren16 EA$5,950$5,9503
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette1 EA$10,000$10,5003
Mar 25, 2025Installation of Median Cable Barrier on I-22 from Coldwater River to the Marshall County LDeSoto, Marshall88 EA$5,200$5,2505
Jan 28, 2025Wayne Installation of Ramp Gates on I-59 from the Louisiana State Line to north of US 84 &Lincoln, Pike, Forrest, Jones, Lamar, Pearl River, Adams2 EA$13,250$13,2503
Nov 26, 2024Pearl River Installation of Median Cable Barrier & Bridge Pier Protection along I-59 from Clarke, Jasper54 EA$5,500–1
Oct 22, 2024Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren2 EA$8,060$10,1302
Aug 27, 2024Construction project, Yalobusha CountyYalobusha81 EA$5,560$5,3632
Mar 26, 2024Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike61 EA$7,250$6,9502
Jan 24, 2024Construction project, Jackson CountyJackson12 EA$5,890$5,6952
Dec 5, 2023Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison16 EA$5,700–1
Jun 27, 2023Safety Improvements on approximatelyLowndes23 EA$5,500$5,7002
Oct 25, 2022Construction project, Oktibbeha CountyOktibbeha46 EA$5,000–1
Nov 23, 2021Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington20 EA$4,342$4,2212
Jul 27, 2021Pavement Restoration approximately 14 miles on I-59 from the Lamar County Line to the JoneForrest, Jones18 EA$4,977$4,5902
Nov 24, 2020Construction project, Madison CountyMadison2 EA$1.00$5007
Jun 23, 2020Construction projectDistrict 22 EA$4,000$4,5002
Mar 24, 2020Construction project, Jackson CountyJackson2 EA$5,500–3

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access