Traffic Signal Conduit, Underground, Type 4, 2": Mississippi winning bid prices

The low bidder priced traffic signal conduit, underground, type 4, 2" at a median $11.00 per linear foot over the last 12 months (6 contracts), down 8% from the year before and up 27% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$11.00
6 contracts
Median, prior 12 months
$12.00
6 contracts
Median, 2020
$8.68
2 contracts
Winner vs. field
2% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$5$10$15$20$252020202120222023202420252026*$11.00
Price vs. quantityEvery winning price since 2020 (log scale)
$0$20$40$60101001.0K10K
Does quantity matter?Median winning price by quantity band
$0$5$10$15$11.21≤136$10.53136–200$11.90200–669$10.50>669

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison160 LF$12.65$17.003
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin725 LF$4.50$4.786
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest940 LF$12.00$12.003
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee240 LF$13.00$13.005
Jun 5, 2026Mill & Overlay approximately 3 miles of MS 16/149 from MS 3 to US 49Yazoo100 LF$1.00–1
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee4.2K LF$10.00$10.002
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette1.3K LF$15.00$15.003
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison14K LF$9.00$9.553
Jul 22, 2025Mill & Overlay approximately 3 miles of US 98 from 400 feet west of Weathersby Drive to thLamar, Forrest50 LF$57.00$55.002
Jun 24, 2025Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson1.5K LF$14.00$13.302
Apr 22, 2025Intersection Improvements on US 49 from Desoto Park Road to 500' south of East Wortham RoaHarrison269 LF$10.00$11.002
Nov 26, 2024Intersection Improvements on US 49 at SR 35Covington212 LF$1.30$1.203
Sep 25, 2024Construction project, Pontotoc CountyPontotoc133 LF$25.00–1
Jul 11, 2024Construction project, Madison CountyMadison229 LF$34.34$34.493
Jun 11, 2024Construction project, Lafayette CountyLafayette350 LF$12.00$16.255
May 29, 2024Traffic Signal Installation on US 49W at SRSunflower135 LF$17.00$14.502
Jan 31, 2024Intersection Improvements on USDeSoto200 LF$13.70$6.594
Jan 24, 2024Construction project, Hinds CountyHinds200 LF$25.00$26.502
Jan 24, 2024Intersection Improvements at SRSmith135 LF$12.00$12.005
Jan 24, 2024Construction project, Harrison CountyHarrison275 LF$12.77–1

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.