BidCrew Data
BidCrew Data / Mississippi / Prices / Loose Riprap, Size 100
MDOT pay item · 815-A002

Loose Riprap, Size 100: Mississippi winning bid prices

The low bidder priced loose riprap, size 100 at a median $124 per ton over the last 12 months (6 contracts), up 21% from the year before and up 106% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$124
6 contracts
Median, prior 12 months
$103
5 contracts
Median, 2020
$60.00
5 contracts
Winner vs. field
7% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$40$60$80$100$120$140$1602020202120222023202420252026*$124
Price vs. quantityEvery winning price since 2020 (log scale)
$0$50$100$150$2001001.0K10K
Does quantity matter?Median winning price by quantity band
$0$25$50$75$100$125$92.50≤92$10692–258$83.50258–1.2K$81.00>1.2K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison1.3K TON$122$1253
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall80 TON$165$1664
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn388 TON$150$1507
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie347 TON$83.50$89.636
Apr 28, 2026I-10 Jackson County Welcome CenterJackson60 TON$126$1614
Feb 3, 2026Slide Repair on US 61 Southbound across from Fire Tower RoadAdams480 TON$100$1004
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette3.2K TON$67.00$78.003
Jun 26, 2025Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton542 TON$103$1033
Jun 24, 2025Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson120 TON$100$1202
May 28, 2025Mill & Overlay approximately 4 miles of SR 485 from SR 15 to SR 21Neshoba252 TON$124$1504
Mar 25, 2025Mill & Overlay approximately 7 miles of I-20 from 5.1 miles east of SR 15 to 2.3 miles easNewton104 TON$225–1
Oct 22, 2024Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc13 TON$65.00$77.504
Jul 11, 2024Construction project, Madison CountyMadison620 TON$87.00$93.503
Apr 23, 2024Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah1.2K TON$65.00$68.502
Jan 24, 2024Safety Improvements on approximatelyLowndes2.0K TON$55.00$72.503
Dec 5, 2023Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison8.4K TON$133–1
Dec 5, 2023Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison3.9K TON$94.95$1222
Nov 2, 2023Bridge Replacements & Bank Stabilization on US 98 at the Pearl River (Bridge Nos. 118.5A &Marion48 TON$120$1602
Oct 24, 2023Overlay approximatelyRankin168 TON$150$1203
Aug 22, 2023Intersection Improvements on USMadison37 TON$85.00$96.503

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access