BidCrew Data
BidCrew Data / Mississippi / Prices / 24" Reinforced Concrete Pipe, Class III
MDOT pay item · 603-CA026

24" Reinforced Concrete Pipe, Class III: Mississippi winning bid prices

The low bidder priced 24" reinforced concrete pipe, class iii at a median $105 per linear foot over the last 12 months (15 contracts), down 4% from the year before and up 72% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$105
15 contracts
Median, prior 12 months
$109
15 contracts
Median, 2020
$60.83
6 contracts
Winner vs. field
6% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$50$100$150$2002020202120222023202420252026*$110
Price vs. quantityEvery winning price since 2020 (log scale)
$50$100$150$200$250$300101001.0K
Does quantity matter?Median winning price by quantity band
$0$50$100$150$134≤48$10048–120$100120–288$80.00>288

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery16 LF$220–1
Oct 27, 2026Construction project, Madison CountyMadison824 LF$94.60$1013
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren88 LF$125$1473
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin176 LF$125$1064
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson40 LF$116–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin512 LF$101$1056
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha112 LF$120–4
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie216 LF$70.00$82.976
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren32 LF$210$2103
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest80 LF$91.25$93.403
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto216 LF$72.00$1006
May 27, 2026Overlay approximately 11.4 miles of SR 15 from Ovett-Scarbrough Road to south of Tuckers CJones8 LF$151$1382
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin208 LF$90.00$1042
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette184 LF$105$1105
Nov 25, 2025Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe80 LF$60.00$1204
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette2.2K LF$75.00$89.003
Sep 4, 2025Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln81 LF$102$1043
Aug 26, 2025Mill & Overlay approximately 9 miles of SR 346 from the beginning of State Maintenance to Pontotoc80 LF$150$2365
Jun 26, 2025Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton184 LF$110$1103
Apr 1, 2025Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba288 LF$100$1062

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access