BidCrew Data
BidCrew Data / Mississippi / Prices / Electric Cable, Underground in Conduit, IMSA 20-1, AWG 8, 3 Conductor
MDOT pay item · 907-636-B028

Electric Cable, Underground in Conduit, IMSA 20-1, AWG 8, 3 Conductor: Mississippi winning bid prices

The low bidder priced electric cable, underground in conduit, imsa 20-1, awg 8, 3 conductor at a median $6.70 per linear foot over the last 12 months (1 contracts), up 44% from the year before and up 198% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$6.70
1 contracts
Median, prior 12 months
$4.65
5 contracts
Median, 2020
$2.25
1 contracts
Winner vs. field
1% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$2.5$5$7.5$10$12.52020202120222023202420252026*$6.70
Price vs. quantityEvery winning price since 2020 (log scale)
$2.5$5$7.5$10$12.5$151001.0K
Does quantity matter?Median winning price by quantity band
$0$2$4$6$6.00≤72$5.8072–140$5.35140–524$3.70>524

The last 19 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest195 LF$6.70$6.703
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette742 LF$5.00$5.003
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison1.8K LF$4.50$4.703
Jun 24, 2025Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson135 LF$4.65$10.322
Apr 22, 2025Intersection Improvements on US 49 from Desoto Park Road to 500' south of East Wortham RoaHarrison50 LF$4.00$7.002
Nov 26, 2024Intersection Improvements on US 49 at SR 35Covington78 LF$11.65$10.903
Sep 25, 2024Construction project, Pontotoc CountyPontotoc165 LF$11.00–1
Jul 11, 2024Construction project, Madison CountyMadison69 LF$13.78$13.623
Mar 26, 2024Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike2.9K LF$3.20$3.102
Jan 24, 2024Intersection Improvements at SRSmith20 LF$6.00$5.755
Jan 24, 2024Construction project, Harrison CountyHarrison95 LF$5.80–1
Dec 5, 2023Bridge Replacement on US 11 at Hobolochitto Creek in Picayune (Bridge No. 11.3), known as Pearl River140 LF$4.45$4.455
Oct 25, 2022Construction project, Harrison CountyHarrison940 LF$3.30$4.353
Oct 25, 2022Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson25 LF$11.50$12.652
Jan 25, 2022Construction project, DeSoto CountyDeSoto280 LF$4.00$4.302
Jan 25, 2022Construction project, Hancock CountyHancock3.3K LF$3.70$3.734
Nov 23, 2021Safety Improvements on I-110 Southbound at USHarrison75 LF$6.00$5.753
May 25, 2021Intersection Improvements on USWilkinson60 LF$6.00$7.082
Feb 25, 2020Construction project, DeSoto CountyDeSoto306 LF$2.25$2.613

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.