BidCrew Data
BidCrew Data / Mississippi / Prices / 6" Thermoplastic Double Drop Edge Stripe, Continuous Yellow
MDOT pay item · 907-626-F004

6" Thermoplastic Double Drop Edge Stripe, Continuous Yellow: Mississippi winning bid prices

The low bidder priced 6" thermoplastic double drop edge stripe, continuous yellow at a median $3.45 per linear foot over the last 12 months (6 contracts), down 45% from the year before and down 42% since 2024.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$3.45
6 contracts
Median, prior 12 months
$6.25
6 contracts
Median, 2024
$5.95
6 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$2$4$6$8$102020202120222023202420252026*$6.18
Price vs. quantityEvery winning price since 2020 (log scale)
$0$5$10$151.0K10K
Does quantity matter?Median winning price by quantity band
$0$2.5$5$7.5$10$10.00≤814$4.88814–1.9K$5.151.9K–6.3K$2.88>6.3K

The last 17 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Apr 28, 2026I-10 Jackson County Welcome CenterJackson1.7K LF$2.35$2.334
Feb 3, 2026Slide Repair on US 61 Southbound across from Fire Tower RoadAdams740 LF$10.00$11.254
Nov 25, 2025Bridge Repairs on South Lamar Boulevard over US 278 & SR 7 over MS Central RR , Bridge NosLafayette500 LF$16.00$16.756
Nov 25, 2025Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith6.3K LF$1.90$1.957
Nov 25, 2025Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington8.8K LF$2.50$2.274
Oct 28, 2025Bridge Repair on Craft Road & Miller Road over US 78 (Bridge Nos. 1.4 & 8.5) & on SR 309 oDeSoto, Marshall4.7K LF$4.40$4.405
Sep 4, 2025Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln7.6K LF$2.90$3.003
Aug 26, 2025Remove & Replace High Friction Surface Treatment (Bridge Nos. 96.3A & 96.3B) on I-55 northHinds3.0K LF$9.00$7.003
Jul 22, 2025Bridge Repair on West Whitworth Street over I-55 (Bridge No. 60.0)Copiah608 LF$8.80$8.902
Apr 22, 2025Intersection Improvements on US 49 from Desoto Park Road to 500' south of East Wortham RoaHarrison1.9K LF$3.75$4.132
Jan 28, 2025Wayne Installation of Ramp Gates on I-59 from the Louisiana State Line to north of US 84 &Lincoln, Pike, Forrest, Jones, Lamar, Pearl River, Adams814 LF$6.50$6.503
Nov 26, 2024Bridge Repair on US 278 (Bridge No. 121.7A)Lee960 LF$6.00$6.754
Oct 22, 2024Intersection Improvements on various routes throughout the DistrictDistrict 749K LF$2.85–1
Oct 22, 2024Safety Improvements on SR 25 at Longview RoadOktibbeha4.4K LF$5.90$5.452
Oct 22, 2024Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren18K LF$4.90$4.902
Oct 10, 2024Emergency Milling, Leveling, Overlaying & applying High Friction Surface Treatment approxiLauderdale1.7K LF$6.30$5.532
Sep 25, 2024Construction project, Lauderdale CountyLauderdale325 LF$11.00$11.003

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access