The low bidder priced inlet siltation guard at a median $653 per each over the last 12 months (10 contracts), down 12% from the year before and up 12% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 15 EA | $656 | $656 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 4 EA | $550 | $780 | 3 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 51 EA | $579 | $704 | 6 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 1 EA | $1,250 | – | 4 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 3 EA | $600 | $959 | 3 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 5 EA | $650 | $650 | 6 |
| May 27, 2026 | Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee | 8 EA | $1,000 | $1,025 | 2 |
| Apr 28, 2026 | I-10 Jackson County Welcome CenterJackson | 12 EA | $553 | $376 | 4 |
| Nov 25, 2025 | Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe | 1 EA | $800 | $1,180 | 4 |
| Nov 25, 2025 | Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington | 8 EA | $747 | $739 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 35 EA | $650 | $744 | 3 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 125 EA | $725 | $725 | 3 |
| Jun 24, 2025 | Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson | 2 EA | $757 | $764 | 2 |
| Apr 1, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 7 EA | $600 | $800 | 2 |
| Mar 25, 2025 | Installation of Median Cable Barrier on I-22 from Coldwater River to the Marshall County LDeSoto, Marshall | 147 EA | $800 | $700 | 5 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 20 EA | $700 | $735 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 10 EA | $752 | $850 | 5 |
| Feb 4, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 7 EA | $1,000 | – | 1 |
| Jan 28, 2025 | Widen & Overlay approximately 11 miles of SR 28 from 2.4 miles east of Dennis Cross Road tJefferson | 2 EA | $1,000 | $918 | 2 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 7 EA | $706 | $706 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.