BidCrew Data
BidCrew Data / Mississippi / Prices / Barricades, Type III, Single Faced
MDOT pay item · 619-G4005

Barricades, Type III, Single Faced: Mississippi winning bid prices

The low bidder priced barricades, type iii, single faced at a median $23.10 per linear foot over the last 12 months (39 contracts), down 4% from the year before and up 38% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$23.10
39 contracts
Median, prior 12 months
$24.00
49 contracts
Median, 2020
$16.75
22 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$10$15$20$25$302020202120222023202420252026*$23.33
Price vs. quantityEvery winning price since 2020 (log scale)
$10$20$30$40$501001.0K
Does quantity matter?Median winning price by quantity band
$0$5$10$15$20$25$21.38≤48$17.1548–72$21.0072–168$21.60>168

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026OGFC Lift on I-59 from US 45 to approximately 0.248 miles north of the Russell InterchangeLauderdale120 LF$21.74–1
Oct 27, 2026Construction project, Madison CountyMadison228 LF$32.35$32.353
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren348 LF$29.50$29.503
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin432 LF$36.04$33.244
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson528 LF$23.60–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin514 LF$29.50$29.156
Sep 22, 2026Bridge Repair on SR 433 over Mound Creek (Bridge No. 11.6)Yazoo24 LF$24.70$24.354
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha480 LF$21.99–4
Sep 22, 2026Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington24 LF$22.00$28.524
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike144 LF$23.05$24.003
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey48 LF$25.00$24.003
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee48 LF$14.00$15.478
Jul 28, 2026Bridge Repair on SR 16/SR 149 over SR 3 & Yazoo River (Bridge No. 203.3)Yazoo48 LF$26.00$25.005
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest48 LF$28.25$38.603
Jul 28, 2026Bridge Repair on US 98 over I-59 (Bridge No. 149.1)Lamar102 LF$24.00$23.554
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison12 LF$40.98$40.983
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee60 LF$14.00$15.005
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto192 LF$14.00$15.306
May 27, 2026Thin Lift Overlay of MS 16 from Thompson Drive to the Intersection of MS 15Neshoba36 LF$21.25$18.635
May 27, 2026Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake48 LF$23.65$21.528

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access