MDOT let 1 contract worth $1.8M at the low bid, with 4.00 bidders per contract (the 12-month average is 3.70). T. L. Wallace Construction, Inc. won the most, $1.8M.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 1 | Emergency Slide Repair on SRGeorge · Construction & widening · 108903301 | T. L. Wallace Construction, Inc.2nd: Holliday Construction, LLC | $1.8M | $2.2M | 19.7% | 4 | −23.4% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.