MDOT let 1 contract worth $76K at the low bid, with 4.00 bidders per contract (the 12-month average is 3.70). Century Construction Group, Inc. won the most, $76K. MDOT later rejected the bids on 1 more contract from this letting and re-let it.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2 | Bridge Repair on USMontgomery · Bridge repair & rehab · 308207301 | Century Construction Group, Inc.2nd: Key, LLC | $76K | $125K | 63.4% | 4 | −1.0% |
| Call | Contract | Low bidder | Low bid | Bidders | vs. estimate | Re-let |
|---|---|---|---|---|---|---|
| 1 | Emergency Bridge Repair on USMarion · 102445302 | Riverside Construction Company, Inc. | $1.2M | 2 | – | Dec 2, 2022 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.