MDOT let 10 contracts worth $37.7M at the low bid, with 1.70 bidders per contract (the 12-month average is 3.70). APAC - Mississippi, Inc. won the most, $16.6M; 8 firms won at least one contract. The closest finish: Bridge Repair on SR, decided by 1.1% ($15K).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 6 | Overlay approximately 16 miles of SR 448 from SR 1 to USBolivar · Overlay & resurfacing · 108694301 | APAC - Mississippi, Inc. | $6.4M | – | – | 1 | +6.8% |
| 5 | Overlay approximately 15 miles of SR 446 from SR 1 to USBolivar · Overlay & resurfacing · 108693301 | APAC - Mississippi, Inc. | $5.2M | – | – | 1 | +9.1% |
| 10 | Overlay approximatelyBenton · Overlay & resurfacing · 108941301 | APAC - Mississippi, Inc.2nd: A J Construction, Inc. | $5.0M | $5.3M | 6.2% | 2 | −18.8% |
| 2 | Overlay approximatelyPearl River · Overlay & resurfacing · 108704301 | Huey P Stockstill, LLC | $4.8M | – | – | 1 | +8.7% |
| 9 | Overlay approximatelyTippah · Overlay & resurfacing · 108910301 | WG Construction Company, Inc.2nd: APAC - Mississippi, Inc. | $4.0M | $4.3M | 5.9% | 2 | +5.1% |
| 8 | Construction project, Coahoma CountyCoahoma · Construction & widening · 109224301 | Road Worx, Inc.2nd: Phillips Contracting Co., Inc. | $4.0M | $4.5M | 13.6% | 2 | −3.5% |
| 7 | Mill & Overlay approximately 9.5 miles of SR 389 from the Clay County Line to SRChickasaw · Overlay & resurfacing · 108909301 | Falcon Contracting Company, Inc.2nd: APAC - Mississippi, Inc. | $3.7M | $3.9M | 5.8% | 2 | +5.5% |
| 4 | Widen & Overlay approximately 8 miles of SR 43 from SR 28 to SRSimpson · Overlay & resurfacing · 109395301 | A J Construction, Inc.2nd: APAC - Mississippi, Inc. | $2.6M | $2.7M | 3.6% | 2 | −7.4% |
| 3 | Bridge Repair on SRCarroll · Bridge repair & rehab · 109300301 | Talbot Brothers Contracting Co., Inc.2nd: Key, LLC | $1.3M | $1.4M | 1.1% | 3 | +21.1% |
| 11 | Construction projectDistrict 5 · Construction & widening · 307930301 | Akca, LLC | $660K | – | – | 1 | −5.8% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.