MDOT let 1 contract worth $2.2M at the low bid, with 1.00 bidders per contract (the 12-month average is 3.70). Paramount Construction Group, LLC won the most, $2.2M.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 1 | Construction of Administration Building Water Well UpgradesHinds · Buildings & other · 503622301 | Paramount Construction Group, LLC | $2.2M | – | – | 1 | +7.3% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.