MDOT let 5 contracts worth $15.8M at the low bid, with 2.00 bidders per contract (the 12-month average is 3.70). A J Construction, Inc. won the most, $5.5M; 5 firms won at least one contract. The closest finish: Mill & Overlay approximately 15 miles of SR 12 from US 49W to US 49E, known as F, decided by 0.4% ($20K).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 1 | Mill & Overlay approximately 15 miles of SR 12 from US 49W to US 49E, known as Federal Aid Project No. STP-0018-02(059) Humphreys, Holmes · Overlay & resurfacing · 108214301 | A J Construction, Inc.2nd: APAC - Mississippi, Inc. | $5.5M | $5.6M | 0.4% | 2 | −10.4% |
| 3 | Overlay approximately 8 miles of SR 27 from Dewey Ballard Road to just north of US 84 & Roundabout Construction on SR 27Lawrence · Overlay & resurfacing · 109246301 | Walters Construction Co., Inc.2nd: Dickerson & Bowen, Inc. | $5.4M | $5.6M | 3.9% | 2 | −14.4% |
| 2 | Placement of Audible Stripe on SR 28 & SRCopiah, Jefferson · Intersections & safety · 109550301 | Traffic Control Products Company, Inc. | $2.6M | – | – | 1 | −1.3% |
| 4 | Overlay approximately 6 miles of SR 42 from the intersection of SR 15 to the Greene County LinePerry · Overlay & resurfacing · 109242301 | Dunn Roadbuilders, LLC2nd: Warren Paving, Inc. | $1.8M | $2.0M | 11.2% | 3 | −28.1% |
| 6 | Humphreys Placement of Stripe on various routes throughout the DistrictBolivar, Sunflower, Washington · Construction & widening · 1088113031 | Arkansas Sign & Barricade, Inc.2nd: J. C. Cheek Contractors, Inc. | $474K | $553K | 16.6% | 2 | −22.2% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.