MDOT let 2 contracts worth $6.1M at the low bid, with 3.00 bidders per contract (the 12-month average is 3.70). T. L. Wallace Construction, Inc. won the most, $3.1M; 2 firms won at least one contract. The closest finish: Overlay approximately 2.5 miles of SR 468 from US, decided by 5.5% ($163K).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 7 | Construction project, Kemper CountyKemper · Construction & widening · 308840302 | T. L. Wallace Construction, Inc.2nd: Vance Brothers, LLC | $3.1M | $4.1M | 31.0% | 2 | −7.4% |
| 5 | Overlay approximately 2.5 miles of SR 468 from USRankin · Overlay & resurfacing · 109000301 | APAC - Mississippi, Inc.2nd: Dickerson & Bowen, Inc. | $3.0M | $3.2M | 5.5% | 4 | −27.9% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.